Manufacturing News

Airbus Tianjin to deliver 26 aircraft in 2010

The Airbus final assembly line project in Tianjin will assemble and deliver 26 A320 aircraft in 2010, more than double the number in 2009.

The production capacity of the Airbus final assembly line project in Tianjin is increasing continuously. Airbus China recently said that the Airbus final assembly line project in Tianjin successfully finished the task of assembling and delivering 11 Airbus A320 aircraft in 2009 and it plans to assemble and deliver 26 A320 aircraft in 2010.

By the end of 2011, the Airbus final assembly line project in Tianjin will reach its maximum production capacity, enabling it to assemble 4 aircraft per month and starting from 2012, the Airbus final assembly line project in Tianjin will assemble 48 aircraft each year.

Most Viewed in 24 Hours

Special

Start a Digital Twin Journey from Engineering Simulation

Accenture releases survey of digital transformation

CIMC Reduces Unplanned Downtime by 30% with Greater Operational Insight from ThingWorx

Ansys Simulation Speeding up Autonomous Vehicles

回到顶部
  • Tel : 0086-27-87592219
  • Email : service@e-works.net.cn
  • Add: 3B1 International Business Center, No. 18 Jinronggang Road (No.4), East Lake High-tech Development Zone, Wuhan, Hubei, PRC. 430223
  • ICP Business License: 鄂B2-20030029-9
  • Copyright © e-works All Rights Reserved